Services
Emergency
Language
Home/Services/Generators & electrical
Generators & electrical

Generators, motors and the protection around them.

Turbogenerator overhauls and rewinds, electrical testing that finds faults before they trip the unit, and the HV, protection and switchgear work that keeps a plant connected.

RewindsTestingMotorsHV & protection

Generator overhaul

Rotor out, stator surveyed, everything cleaned and tested, and the cooling and excitation systems brought back to specification.

BrushGESiemensABBWEGToshiba
  • Rotor removal and inspection
  • Stator wedge tightness survey and re-wedging
  • Dry-ice cleaning of windings
  • Retaining ring inspection
  • Brushless exciter and rotating diode checks
  • Cooling system and heat exchanger service

Rewinds

Full or partial rewinds when testing shows the insulation has reached the end of its life.

  • Stator rewind, full or partial
  • Rotor rewind and re-insulation
  • New coils and insulation systems
  • VPI and resin systems
  • Post-rewind high-voltage testing

Electrical testing & diagnostics

Tests that tell you the condition of the insulation and the windings, with trends you can compare at the next outage.

  • Insulation resistance and polarisation index
  • Winding resistance and hipot
  • Partial discharge, online and offline
  • ELCID and loop test of the stator core
  • Tan delta / power factor
  • RSO for rotor shorted turns

Motors & drives

Medium and low-voltage motors repaired and rewound, and the drives that run them serviced.

  • MV and LV motor repair and rewind
  • Bearings, balancing and alignment
  • VFD inspection and service
  • Motor condition testing

HV, protection & switchgear

The electrical chain from the generator terminals to the point of interconnection.

  • Protection relay testing and settings review
  • Switchgear and breaker maintenance
  • Transformer testing and oil analysis
  • AVR and synchronising checks
  • Grounding and arc-flash studies
  • Interconnection test support (IEEE 1547)
What you receive

Records at every decision point.

You approve the work from evidence, and you keep the evidence after the unit is back in service.

Before work

Findings report

Photo-documented teardown findings, measurements against limits and a repair disposition for every part.

Decision point

Priced scope

Line-item quote for repair, replace or exchange, with turnaround for each option, before work is released.

On handover

As-left dossier

Dimensions, clearances, coating and weld records, balance reports, test data and the next-interval plan.

Unit tripped · forced outage

A machine down is a clock running.

Call the emergency desk. An engineer takes the first diagnosis by phone, asks for trend data and borescope access, and mobilises a field crew when the problem cannot be cleared remotely.